null

Rogz Control Moxon Long Lead Black 1.8m

Rogz

RRP: $38.99
$33.14
(You save $5.85 )
(No reviews yet) Write a Review
SKU:
HLXR12A
UPC:
649510024207
Pet:
Dog
Colour:
Black
Adding to cart… The item has been added

Rogz Control Moxon Long Lead in Black is 1.8m long by 12mm wide. The Moxon Rope Lead by Rogz is perfect for control and protection. Having control of your dog on walks is essential for a happy dog and a happy owner, and the right type of walking equipment can help.

  • Perfect for control and protection.
  • Convenient: Two-in-one collar and lead.
  • Reflective Yarn woven into webbing and piping for night visibility.

Materials

  • Webbing: 100% Abrasion-Resistant Nylon.
  • Reflective Stitching: Nylon.
  • Rope Stopper and Die-Cast Ring: Zinc.